Cahuilla II Reservoir

Summary

SCH Number
2007019008
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Cahuilla II Reservoir
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2007
Document Description
The Department is issuing a Lake and Streambed Alteration Agreement for the proejct proponent who proposes the construction of a single, 12-million gallon steel water reservoir situated on or adjacent to the foothills of the Santa Rosa Mountains. The project also involves the extension of an access road and water transmission line. The project will result in construction of a stormwater intercept system, of which a portion will be constructed within and adjacent to a portion of an unnamed blueline stream with a limited drainage area emanating from the adjoining foothills. This intercept system is comprised of a stormwater inlet structure that connects with two 48-inch diameter drain pipe transitions to a 54-inch diameter drain pipe located along the eastern portion of the reservoir. This extends to a point of discharge through an energy dissipater and into the downstream portion of the drainage. On-site and slope runoff will be collected and conveyed through two 36-inch diameter laterals to a 48-inch diameter mainline pipe. The project will permanently impact approximately 1.5 acres of the streambed. The proponent shall mitigate the permanent impact to the 1.5 acres of desert dry wash woodland at 3:1 through the acquisition of or the placement of a conservation easement on 4.5 acres of desert dry wash woodland habitat.

Contact Information

Name
Eddy Komo
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
La Quinta
Counties
Riverside

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.