Five Mile Slough Outfall Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0172-R2)
4 Documents in Project
Summary
SCH Number
2007012060
Lead Agency
City of Stockton
Document Title
Five Mile Slough Outfall Improvement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0172-R2)
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2016
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0172-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Stockton Public Works Department.
Project is limited to improvements at the outfall at Five Mile Slough where it is crossed by Pershing Avenue. Five Mile Slough flows below Pershing Avenue through a dual box culvert 5 feet high by 10 feet wide. The proposed improvements include upgrading the existing 15-inch diameter outfall pipe to a 42 inch diameter pipe. The location where the existing outfall empties into the box culvert will be enlarged to accommodate the new pipe size. A new outfall location will not be created. The majority of the work necessary to install the new pipe will take place from the road above, outside Five Mile Slough. It is anticipated that coffer dams will be installed at both ends of the north barrel, diverting the water through the south barrel, so work can be conducted on the wall opening. Access to the slough is narrow, and therefore it is anticipated that heavy equipment will operate from the road, not from areas within the slough.
Contact Information
Name
Kyle Stoner
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Stockton
Counties
San Joaquin
Cross Streets
Thornton Road, Kelly Drive
Zip
95209
State Highways
I-5
Schools
Lincoln HS, Colonial Heights MS, Lincoln ES
Township
2N
Range
6E
Section
17
Base
MDM
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.