Hammer Lane Widening - Pershing Avenue/Five Mile SLough Outfall Improvement Project

4 Documents in Project

Summary

SCH Number
2007012060
Lead Agency
City of Stockton
Document Title
Hammer Lane Widening - Pershing Avenue/Five Mile SLough Outfall Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2009
Document Description
Hammer Lane widening - Pershing Avenue/Five Mile Slough Outfall Improvement Project - Project activities include drainage improvements at the Pershing Avenue/Five Mile Slough outfall. The City of Stockton proposes upgrading the exisitng 15 in diameter culvert to a 30-42 in diameter culvert. The current opening into the box culvert will be enlarged to accommodate the new pipe size. A new outfall location will not be created. The majority of the work necessary to install the new culvert will take place from teh road above, outside Five Mile Slough. It is anticipated that a coffer dam will be installed at both ends of the north barrel, diverting the water through the south barrel, so work can be conducted on the wall opening. Access to the slough is narrow and therefore, it is anticipated that there won't be any heavy equipment within the slough.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Thornton Road, Kelly Drive
Zip
95209
State Highways
I-5
Schools
Lincoln HS, Colonial Heights MS, Lincoln ES
Township
2N
Range
6E
Section
17
Base
MDM

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print