Copper Cove Booster Pump and Water Transmission Pipeline Project

2 Documents in Project

Summary

SCH Number
2007012054
Lead Agency
Calaveras County Water District (CCWD)
Document Title
Copper Cove Booster Pump and Water Transmission Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2007
Present Land Use
Rural Residential, Traditional Single Family Residential, and Public Services Zone
Document Description
The proposed project would construct and operate a water transmission pipeline and booster pump station to remedy distribution demands identified as part of the Calaveras County Water District's (CCWD) Copper Cove Water System Master Plan Update. The transmission line would convey water from the current water treatment plant (WTP) on Little John Road to the two 500,000-gallon tanks at the top of a hill on Charm Stone Way. The proposed 20-inch diameter water transmission line would be approximately 12,000 feet in overall length with about half the length of pipeline crossing through privately-owned Oak studded grasslands. The remaining half of the pipeline and booster pump station would be placed within existing streets, public right-of-ways, and utility easements. The project is intended to replace and upgrade an existing 30-year old 10-inch diameter water transmission line and construct a new booster pump station as well as increase the capacity of these water transmission and pumping facilities.

Contact Information

Name
Steve Hutchings
Agency Name
Calaveras County Water District
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
Little John Road and Saddle Creek Drive
State Highways
4
Waterways
Stanislaus River
Other Location Info
City/Nearest Community: Copper Cove

Notice of Determination

Approving Agency
Calaveras County Water District

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes