Wyndham Boutique Hotel/High-Rise Residential Project (Addendum to Final EIR 1054)

6 Documents in Project

Summary

SCH Number
2007011125
Lead Agency
City of Costa Mesa
Document Title
Wyndham Boutique Hotel/High-Rise Residential Project (Addendum to Final EIR 1054)
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2015
Present Land Use
High Density Residential / Planned Development Residential High Density
Document Description
The proposed project involves the demolition of the existing Wyndham Hotel parking garage and the construction of a 100-unit condominium tower adjacent to a new, proposed 6.5-level parking garage consisting of 1 subterranean level and 5.5 levels above ground. The residential tower would be constructed adjacent to the existing 235-unit Wyndam Hotel, which would be retained as part of the proposed project. This project represents a modification to the approval development plan and it was determined that, when compared to the previously certified Final EIR 1054, no new impacts would occur nor would there be any substantial increase in the severity of any previously identified impacts.

Contact Information

Name
Claire Flynn
Agency Name
City of Costa Mesa
Contact Types
Lead/Public Agency

Location

Cities
Costa Mesa
Counties
Orange
Cross Streets
Avenue of the Arts / Anton Boulevard
Zip
92626
Total Acres
3
State Highways
405
Airports
SNA

Notice of Determination

Approving Agency
City of Costa Mesa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print