Wyndham Boutique Hotel/High-Rise Residential Project
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007011125
- Lead Agency
- Costa Mesa, City of (City of Costa Mesa)
- Document Title
- Wyndham Boutique Hotel/High-Rise Residential Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/21/2007
- Present Land Use
- High Density Residential / Planned Development Residential High Density
- Document Description
- The proposed "Wyndham Boutique Hotel/High-Rise Residential Project" involves reuse of the project site as a mixed-use development with both hotel and residential uses. The existing Wyndham Hotel would be renovated. Although there would be no change to the building square footage associated with the hotel, there would be reduction in hotel rooms create a boutique hotel. To accommodate the proposed 23-story, 120-unit high-rise residential tower, the existing hotel parking structure would be demolished. A seven-level parking structure (480 parking spaces) would be constructed east of the new residential tower to serve the residential tower to serve the residential tower and the hotel. The project includes a General Plan amendment for a site-specific density and FAR, North Costa Mesa Specific Plan amendment for additional development standards, Final Master Plan, and Vesting Tentative Tract Map. Overrule of the Airport Land Use Commission's Inconsistency Determination was also required.
- Contact Information
-
Claire Flynn
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92628
Phone : (714) 754-7258
Location
- Cities
- Costa Mesa
- Counties
- Orange
- Cross Streets
- Avenue of the Arts / Anton Boulevard
- Zip
- 92626
- Total Acres
- 3
- State Highways
- 405
- Airports
- SNA
Notice of Determination
- Approving Agency
- City of Costa Mesa
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Costa mesa 77 Fair Drive Costa Mesa, CA 92628
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.