River Supply Conduit Improvement - Upper Reach
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007011110
- Lead Agency
- Los Angeles, City of (City of Los Angeles)
- Document Title
- River Supply Conduit Improvement - Upper Reach
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/16/2011
- Present Land Use
- Study area includes City of Los Angeles and the City of Burbank. Land Use Designations vary, and would include residential, commercial, industrial, and other land use designations.
- Document Description
- The LADWP proposes to construct a new larger pipeline to replace the upper reach of the existing River Supply Conduit (RSC) pipeline in a new alignment. The proposed pipeline would involve the construction of approximately 31,300 linear feet of 78-inch diameter welded steel underground pipeline, and would also include construction of appurtenant structures (e.g., maintenance/access holes, regulator station, flow meters, valves, and vaults). Construction would occur within existing street rights-of-way, easements, and recreation areas within the Cities of Los Angeles and Burbank.
- Contact Information
-
Erica Blyther
Los Angeles City Department of Water and Power
111 N. Hope Street, Room 1044
Los Angeles, CA 90012
Phone : (213) 367-2325
Location
- Cities
- Burbank Los Angeles Los Angeles, City of, Burbank
- Counties
- Los Angeles
- Cross Streets
- Morella Avenue/Vanowen Street to near Forest Lawn Drive/Mount Sinai Drive
- Zip
- Multiple
- Total Acres
- 5.92 miles
- State Highways
- I-5, Hwy 101, SR 134
- Airports
- Bob Hope Airport
- Schools
- L.A. Unified and private schools
- Waterways
- Los Angeles River, Tujunga Wash, Burbank Western Channel
Notice of Determination
- Approving Agency
- City of Los Angeles
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.