River Supply Conduit Improvement - Upper Reach

5 Documents in Project

Summary

SCH Number
2007011110
Lead Agency
City of Los Angeles
Document Title
River Supply Conduit Improvement - Upper Reach
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2011
Present Land Use
Study area includes City of Los Angeles and the City of Burbank. Land Use Designations vary, and would include residential, commercial, industrial, and other land use designations.
Document Description
The LADWP proposes to construct a new larger pipeline to replace the upper reach of the existing River Supply Conduit (RSC) pipeline in a new alignment. The proposed pipeline would involve the construction of approximately 31,300 linear feet of 78-inch diameter welded steel underground pipeline, and would also include construction of appurtenant structures (e.g., maintenance/access holes, regulator station, flow meters, valves, and vaults). Construction would occur within existing street rights-of-way, easements, and recreation areas within the Cities of Los Angeles and Burbank.

Contact Information

Name
Erica Blyther
Agency Name
Los Angeles City Department of Water and Power
Contact Types
Lead/Public Agency

Location

Cities
Burbank, Los Angeles, Los Angeles, City of, Burbank
Counties
Los Angeles
Cross Streets
Morella Avenue/Vanowen Street to near Forest Lawn Drive/Mount Sinai Drive
Zip
Multiple
Total Acres
5.92 miles
State Highways
I-5, Hwy 101, SR 134
Airports
Bob Hope Airport
Schools
L.A. Unified and private schools
Waterways
Los Angeles River, Tujunga Wash, Burbank Western Channel

Notice of Determination

Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print