Varner Harbor Dredging Project

4 Documents in Project

Summary

SCH Number
2007011103
Lead Agency
California Department of Parks and Recreation
Document Title
Varner Harbor Dredging Project
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2007
Present Land Use
State Recreation Area
Document Description
The Department is issuing a Lake and Streambed Alteration Agreement for the project who proposes to remove 7,000 to 8,000 cubic yards of natural deposit material throughout the 450-foot long harbor channel. All dredged materials will be placed on the beach immediately north of the harbor channel. The dredged material will then be spread over a 1.5-2.0 acre area. All dredged material will be placed behind the berm to prevent any surface flow of dredge material or water back into the sea. If needed, straw waddles will also be placed on the upslope side of the berm to aid in this retention. The project proponent also proposes to reconstruct the north jetty of Varner Harbor before the channel is dredged. The reconstructed jetty will provide access for equipment to conduct dredging on the harbor. This structure will be approximately 200 feet long by 12 feet wide by 6 feet high. The jetty will be constructed of approximately 570 cubic yards of exploded angular rip rap, filter fabric, and native soils. The jetty will be built over the footprint of the original north jetty, which is now submerged below the current level of the sea.

Contact Information

Name
James Sheridan
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Highway 111 and State Park Road
Zip
92254
State Highways
111
Waterways
Salton Sea
Other Location Info
City/Nearest Community: North Shore

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.