Burford Bypass Trust Property
2 Documents in Project
Summary
SCH Number
2007011098
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Burford Bypass Trust Property
Document Type
NOD - Notice of Determination
Received
Posted
3/8/2007
Present Land Use
Vacant
Z: C-G General Commercial
GP: C-G General Commercial and C-T Tourist Commercial
Document Description
The project involves remediation of impacted soils in accordance with the methods and procedures presented in the Draft Removal Action Workplan (RAW), so as to facilitate the purchase of the Site by a major retailer, which will restore the currently vacant Site for economic use. The proposed removal action includes: Clearing the Site of all remnant concrete foundations and any vegetation that may impede the proposed removal action, excavation of approximately 7,000 cubic yards (10,000 tons) of impacted soils from the Site, temporary stockpiling and characterization of impacted soil, loading of excavated soils into trucks or bins, transportation of excavated soils and treatment or disposal at a licensed facility, and confirmation sampling on bottom and sidewalls of excavation to ensure that remediation goals have been achieved.
Contact Information
Name
Joseph Cully
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Blythe
Counties
Riverside
Cross Streets
Intake Boulevard and East Hobsonway
Zip
92225
Total Acres
27
Parcel #
854-090-009, 010, 014; 854-100-005, 008, 009; 854-110-013; 857-210-018
State Highways
I-10 and US 95
Schools
3 ES, 1 MS, 1 HS, 1 continuation school located in Blythe, none
Waterways
Colorado River (~ 3 miles from City of Blythe)
Township
6S
Range
23E
Section
33
Base
SB
Other Information
Schools: none of which are within 1 mile of the Site.
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.