Hudson Ranch Power I, LLC Conditional Use Permit #06-0047
2 Documents in Project
Summary
SCH Number
2007011097
Lead Agency
Imperial County
Document Title
Hudson Ranch Power I, LLC Conditional Use Permit #06-0047
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2019
Present Land Use
Barren (M2G-PE & A-2-G / Planned Industrial & Agriculture with Geothermal Overlay Zone)
Document Description
Seven production and injection wells, two well pads, a geothermal brine processing facility, a turbine-generator facility, and construction of a 92-kV transmission line, located on property consisting of 6.75 acres on Assessor's Parcel Number 020-010-034-000 and 473.25 acres on Assessor's Parcel Number 020-010-035-000. The imperial County Planning and Development Services, as Lead Agency, prepared and approved a Mitigated Neg Declaration in Feb 2007. DOGGR considered the MND prepared by the Lead Agency and issued a Permit to Conduct Well Operations.
DOGGR has approved permits for Hudson Ranch Power I, LLC to drill the geothermal wells listed below, in the Salton Sea geothermal field.
API# 025-91519; Well Name: IW-5
Contact Information
Name
John Huff
Agency Name
DOGGR
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Calipatria
Counties
Imperial
Cross Streets
McDonald Road
Zip
92233
Total Acres
480 +/-
Parcel #
020-010-034, 035
State Highways
111
Waterways
Salton Sea
Township
11S
Range
13E
Section
13
Base
SBBM
Notice of Determination
Approving Agency
DOGGR
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes