Pipe Ditch Maintenance & Diversion (Lake or Streambed Alteration Agreement No. 1600-2016-0140-R1)
18 Documents in Project
Summary
SCH Number
2007011060
Lead Agency
California Department of Fish and Wildlife, Region 1
(CDFW)
Document Title
Pipe Ditch Maintenance & Diversion (Lake or Streambed Alteration Agreement No. 1600-2016-0140-R1)
Document Type
NOD - Notice of Determination
Received
Posted
12/5/2016
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0140-R1, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Mr. Tom Hayden.
The project is limited to activities associated with the annual maintenance/repairs to an existing headgate and fish screen; and the diversion of water from Patterson Creek, Diversion Numbers 400-7 and 401-7 (Pipe Ditch), pursuant to the Applicant's lawful water right (Scott River Adjudication, No. 30662, Jan. 30, 1980). The combined total maximum water right is 6.0 cubic feet per second from April 1 to Oct. 15 for Domestic/irrigation use, and a year round water right of 0.3 cfs for stock water use. The Pipe Ditch Diversion vortex boulder weirs were repaired/reconstructed in 2007 and was funded by the 2006 Klamath River Restoration Grant Program. Maintenance of the diversion intake and fish screen involves the periodic removal of built up debris and silt from around the fish screen using hand tools including shovels, working on screen mechanics, and the occasional minor replacement of hand-stacked rocks on the weir to direct water flow towards teh ditch entrance.
Contact Information
Name
Donna L. Cobb
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Siskiyou
Other Location Info
Horse Creek, tributary to the Klamath River
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.