Approval of an Addendum to the Four-Agency Agreement Re In-Lieu Project, regarding the San Jacinto Agricultural In-Lieu Water Supply Project

6 Documents in Project

Summary

SCH Number
2007011020
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Approval of an Addendum to the Four-Agency Agreement Re In-Lieu Project, regarding the San Jacinto Agricultural In-Lieu Water Supply Project
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2008
Present Land Use
Open Space Conservation and Agricultural
Document Description
Eastern Municipal Water District (EMWD) proposes to install approximately 10,775 linear feet of 24-inch recycled water pipeline to deliver recycled water to two dairy farms. The recycled water will be used for on-farm irrigation in exchange for reductions in groundwater pumping from the San Jacinto groundwater basin that is currently in a state of overdraft. More than half of the groundwater being pumped from the San Jacinto subbasin is being used for agricultural irrigation, the water table levels have dropped, and some wells have gone dry. The proposed recycled water pipeline will reduce groundwater pumping in the San Jacinto subbasin and help stabilize the subbasin. The Addendum makes four minor technical changes to the Four-Agency Agreement Re In-Lieu Project. First, the term is amended to allow renewal or withdrawal at the end of the Agreement's thirty-year term. Second, an additional assurance is added such that Eastern Municipal Water District (EMWD) will utilize the least expensive source of water available in the event neither secondary or tertiary water are available. Third, EMWD agrees to limit any additional agreement providing for the use of recycled water in lieu of groundwater will be limited to groundwater producers in the Management Area and such agreements will not provide parity with or priority over tertiary water. Last, the amending the Exhibits to the Agreement to include updated versions.

Contact Information

Name
Thomas Wagoner
Agency Name
Lake Hemet Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
San Jacinto
Counties
Riverside
Regions
Unincorporated
Cross Streets
Warren Road and Ramona Expressway
Zip
92582
Parcel #
Various
State Highways
79
Waterways
San Jacinto River
Township
4S
Range
1W
Section
Variou
Base
SBBM

Notice of Determination

Approving Agency
Lake Hemet Municipal Water District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print