Balboa Marina Dock Replacement

3 Documents in Project

Summary

SCH Number
2007011017
Lead Agency
City of Newport Beach
Document Title
Balboa Marina Dock Replacement
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2008
Present Land Use
The General Plan and Local Coastal Program Land Use Plan designation for the project site is Recreational Marine Commercial. The project site is developed with a 132 slip marina facility.
Document Description
The project proposes to replace an existing 132 slip, 27,550 sq. ft. dock with a 20,931 sq. ft. dock to accommodate 102 slips ranging from 22 to 58 feet in length. The addendum outlines refinements to the project including the installation of an earth anchor system to the seawall to further enhance stability and safety, the addition of 3 boat slips to the 102 analyzed in the MND for a total of 105 boat slips and the reduction of dredged sediment from 36,000 cubic yards. The refinements do not change the conclusions in the MND and no new impacts will result from the inclusion of the refinements to the proposed project.

Contact Information

Name
Chris Miller
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
East Coast Highway and Bayside Drive
Total Acres
~ 2.74 (water)
State Highways
Highway 1 (PCH)
Schools
Mariners and Our Lady Queen of Angels ES; Corona Del Mar and New
Waterways
Pacific Ocean, Newport Bay
Other Information
Schools: Newport Harbor HS

Notice of Determination

Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print