Barbara and Art Culver Center for the Arts Rouse Building Seismic Upgrade, UCR #950433

Summary

SCH Number
2006129010
Lead Agency
University of California, Riverside
Document Title
Barbara and Art Culver Center for the Arts Rouse Building Seismic Upgrade, UCR #950433
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2006
Document Description
Development of the Culver Center Project includes the renovation and seismic retrofitting of the historic Rouse Building, an approximately 43,000 gross square foot multi-story building formerly occupied as the Rouse Department Store located at 3834 Main Street. The seismic retrofit is necessary to meet current earthquake and building codes, bringing it from a "Very Poor" to a "Good" seismic performance rating as outlined in the UCR seismic safety guidelines. The renovation includes minor demolition and interior program improvements. The Culver Center will serve a variety of art-related uses, including but not limited to, art and dance studios, gallery exhibit space, computer studio, and storage. Additionally, demolition of a 4,500 square foot commercial building (former Wurm's Janitorial Building) along with replacement low-maintenance landscaping is proposed.

Contact Information

Name
Tricia D. Thrasher
Agency Name
University of California, Riverside
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside

Notice of Determination

Approving Agency
University of California, Riverside campus
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print