Action Memorandum / Interim Remedial Action Plan: Non-Time Critical Removal Action for Solid Waste Disposal Areas, Installation Restoration Site 12, Old Bunker
2 Documents in Project
Summary
SCH Number
2006122101
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Action Memorandum / Interim Remedial Action Plan: Non-Time Critical Removal Action for Solid Waste Disposal Areas, Installation Restoration Site 12, Old Bunker
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2007
Present Land Use
Residential
Document Description
DTSC is making a discretionary decision on the Action Memorandum / Interim Remedial Action Plan: Non-Time Critical Removal Action for Solid Waste Disposal Areas, Installation Restoration Site 12, Old Bunker Area, Naval Station Treasure Island, San Francisco, California (AM/IRAP). The AM/IRAP addresses four noncontiguous Solid Waste Disposal Areas (SWDAs) total approximately seven acres, within the 93-acre Installation Restoration (IR) Site 12, at the former Naval Station Treasure Island. These SWDAs include SWDA A&B (3.4 acres), SWDA 1207/1209 (1.9 acres), SWDA 1231/1233 (1.0 acre) and SWDA Bigelow Court (0.54 acre).
Contact Information
Name
Henry Wong
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Francisco
Counties
San Francisco
Cross Streets
Northern end of Treasure Island
Zip
94130
Total Acres
7
State Highways
80
Waterways
San Francisco Bay
Other Location Info
City/Nearest Community: Treasure Island
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.