Homewood Lumber Relocation Project

2 Documents in Project

Summary

SCH Number
2006122083
Lead Agency
Loomis, City of (City of Loomis)
Document Title
Homewood Lumber Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2008
Present Land Use
Vacant / General Commercial / General Commercial

Document Description
SAA# 1600-2008-0152-R2 Fill of approximately 0.918 acres of waters of the U.S. including approximately 0.011 acres of intermittent drainage and 0.907 acres of seasonal wetlands. This fill will be mitigated on site by restoration and creation of 1.24 acres of seasonal witlands through the two step process of lowering/breeching the berm on the seasonal stream of the Loomis tributary to Sucker Ravine and the installation of two weirs that will slow stormwater flows in the stream and allow them to overtop the lower berm and establish the seasonal wetlands. In addition to the wetlands the area will be replanted with native oaks and other native vegetation.

Contact Information
Robert Hosea
Department of Fish and Game
Sacramento Valley and Sierra Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

Phone : (916) 704-9156

Location

Cities
Loomis
Counties
Placer
Cross Streets
Sierra College Boulevard and Brace Road
Total Acres
9
Parcel #
044-123-057, 069
State Highways
I-80
Railways
UPRR

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Town of Loomis 6140 Horseshoe Bar Road, Suite K Loomis, California 95650

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search