Mokelumne Watershed Maintenance Project SAA 1600-2009-0232

5 Documents in Project

Summary

SCH Number
2006122060
Lead Agency
East Bay Municipal Utility District (EBMUD)
Document Title
Mokelumne Watershed Maintenance Project SAA 1600-2009-0232
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2010
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0153-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, East Bay Municipal Utility District. The project is limited the placement of a 5' diameter x 40 foot section of galvanized culvert in an eroding drainage ditch. The bed of the drainage will be prepared by removing rocks to create a smooth platform that is slightly below the natural contour and with a slope not greater than 3%. Approximately 30 yards of native fill will be placed and compacted to secure the culvert. At the inlet and outlet, approximately 3 yards of washed riprap will be installed to armor those areas.

Contact Information

Name
Amy Kennedy
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Jackson
Counties
Calaveras
Total Acres
~29,000
Parcel #
USGS Quads: Ione, Jackson, Mokelumne Hill, Clements, & Wallace
State Highways
12, 26, 49 & 88
Waterways
Mokelumne River, Camanche Reservoir, Pardee Reservoir

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print