March Wastewater Reclamation Facility Phase 2 Expansion

3 Documents in Project

Summary

SCH Number
2006121115
Lead Agency
Western Municipal Water District
Document Title
March Wastewater Reclamation Facility Phase 2 Expansion
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2009
Present Land Use
The wastewater reclamation facility (WRF) site is currently occupied by the existing 1.0 MGD WRF. Interstate 215 lies to the east, with the March Air Reserve Base airfield beyond. An undeveloped portion of the Riverside National Cemetery lies to the north and west. Nandino Avenue lies to the south, with vacant land beyond. The proposed reclaimed water pipeline in El Sobrante Road is surrounded by single-family residential development on the north and the Cajalco Dike and Lake Mathews to the south.
Document Description
Western's March Wastewater Reclamation Facility Phase 2 Expansion includes the expansion of the March Wastewater Reclamation Facility (WRF) from its current capacity of 1.0 million gallons per day (MGD) to a capacity of 3.0 MGD, and the addition of tertiary treatment facilities. The project description included reference to installing a package biofilter scrubber as part of the headworks replacement for odor control. Two additional package biofilter scrubbers will be added for the new sedimentation tanks. They were added to the design after the original MND was adopted by Western's Board. As a result, the MND needs to be amended.

Contact Information

Name
Linda C. Garcia
Agency Name
Western Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
WRF Site: Van Buren Blvd. & I-215; Reclaimed Water Pipeline: McAllister St. & La Sierra Ave
Zip
92518, 03
Total Acres
29.7
Parcel #
295-300-13
State Highways
I-215
Railways
WRF Site: BNSF
Airports
WRF Site: March Air Reserve Base
Schools
WRF Site: Glen View ES, Mead Valley ES, Tomas Rivera MS
Waterways
Reclaimed Water Pipeline: Metropolitan Water District Aqueduct, Lake Mathews
Township
3S, 4S
Range
4W, 5W
Section
6, 35
Base
SBM

Notice of Determination

Approving Agency
Western Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print