West Fontana Channel Flood Control Improvement Project (Streambed Alteration Agreement No. 1600-2016-0232-R6 [Revision 3])
5 Documents in Project
Summary
SCH Number
2006121089
Lead Agency
San Bernardino Flood Control District
Document Title
West Fontana Channel Flood Control Improvement Project (Streambed Alteration Agreement No. 1600-2016-0232-R6 [Revision 3])
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2018
Present Land Use
County: Regional Industrial, City of Fontana: Open space, medium density residential, light industrial
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2016-0232-R6 (Revision 3), pursuant to section 1602 of the Fish and Game Code to the project Applicant, the County of San Bernardino Dept. of Public Works. The West Fontana Channel Flood Control Improvement Project includes construction of approx. 3 miles of concrete channel from Banana Basin to approx. 640 feet west of Juniper Ave. The concrete channel will be constructed at up to 10 feet in width and 4.5 feet in depth. The project will concrete-line approx. 5.82 acres of trapezoidal earthen channel, and channel containing ungrouted rock debris and riprap. Where there is sufficient right-of-way, the channel will feature adjacent parallel bioswales over approx. 7600 linear feet. Each area of bioswale shall be planted according to the calculated inflow of stormwater, and will consist of either highly, moderately, or lightly vegetated areas.
Contact Information
Name
Claire Ingel
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fontana
Counties
San Bernardino
Cross Streets
Banana Ave to Juniper Ave south of Arrow Route
Zip
92335
Parcel #
multiple
State Highways
I 5, I 10
Railways
BNSF/Metro Link
Schools
Redwood & Oleandor
Township
1S
Range
6,5W
Section
10,11,
Base
SBBM
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.