Towncenter Industrial Plaza

2 Documents in Project

Summary

SCH Number
2006121017
Lead Agency
City of Calexico
Document Title
Towncenter Industrial Plaza
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2007
Present Land Use
GP: Industrial and Commercial Z: Commercial Highway (CH) and Industrial Rail (IR)
Document Description
The project proposes a Tentative Tract Map for an approximately 132-acre industrial development. In the City of Calexico General Plan, the proposed project is designated industrial and commercial and zoned Commercial Highway (CH) and Industrial Rail (IR). Proposed zoning for the project once developed will be the same. Development will consist of constructing infrastructure on 48 tracts of land and two fenced detention basins; no structures are planned with the initial development. Site development will include rough grading, underground utility installation, street excavation and construction, and concrete driveway/sidewalk placement. Proposed improvements include the widening of Cole Road and Sunset Boulevard along the project frontage.

Contact Information

Name
Armando G. Villa
Agency Name
City of Calexico
Contact Types
Lead/Public Agency

Location

Cities
Calexico
Counties
Imperial
Cross Streets
Cole Road and Sunset Boulevard
Zip
92231
Total Acres
132
Parcel #
059-020-007
State Highways
SH 98 and SR 111
Railways
SPRR
Airports
Calexico International Airport
Schools
Mains ES, William L. Moreno JH, Dool ES, Kennedy Gardens ES, Roc
Waterways
New River, All-American Canal, and Central Main Canal
Township
17S
Range
14E
Section
2
Base
SBBM
Other Information
Schools: Rockwood ES, De Anza JH, Aurora HS.

Notice of Determination

Approving Agency
Calexico Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.