West Grand Avenue Storm Drain Improvement and Meadow Creek/West Grand Avenue Bridge Replacement

3 Documents in Project

Summary

SCH Number
2006121008
Lead Agency
City of Grover Beach
Document Title
West Grand Avenue Storm Drain Improvement and Meadow Creek/West Grand Avenue Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2008
Present Land Use
Project within public rights-of-way.
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Gaem Code to the project applicant, City of Grover Beach. The project consists of replacing the West Grand Ave. bridge over Meadow Creek and upgrading the stormwater system that outfalls to Meadow Creek near the bridge. The existing bridge will be replaced with a 32' wide span. The existing storm water outfall pipe draining the area east of Highway 1 will be replaced with a 66" diameter storm drain culvert with erosion control/energy dissipating rip rap.

Contact Information

Name
Julie Means
Agency Name
California Dept. of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Grover Beach
Counties
San Luis Obispo
Cross Streets
West Grand Avenue / State Highway 1
Zip
93433
Parcel #
Public rights-of-way
State Highways
1
Railways
UPRR
Airports
Oceano
Schools
Grover ES
Waterways
Meadow Creek

Notice of Determination

Approving Agency
California Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print