Bodega Head Nature Trail Project

2 Documents in Project

Summary

SCH Number
2006112138
Lead Agency
California Department of Parks and Recreation
Document Title
Bodega Head Nature Trail Project
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2007
Present Land Use
Recreation / Open Space / Institutional
Document Description
- Construction of 3,100 linear feet of new 4' wide trail. - Re-alignment of 5,300 linear feet of existing trail. - Reconstruction of trail tread on 1,600 linear feet of existing entrenched trail to encourage proper water drainage. - Full bench construction would be utilized where applicable. Where full bench construction is not possible, trail alignment will be turnpike construction. Trail will be surfaced with compacted 3/4" minus rock material. - All trail construction will conform to existing Regulatory Negotiation Committee accessibility guidelines. - Decommission of 1,076 linear feet of existing poorly aligned, worn and rutted formal and "volunteer" (unauthorized) trail. Reclaimed surfaces will be restored to natural contours. - Construction of 5 interpretive stations, each with an information panel and a picnic table or bench. - Construction of 2 puncheons (elevated crossings) over existing drainages. These will span the creek bed and channel.

Contact Information

Name
Theodore Jackson, Jr.
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Sonoma
Cross Streets
Bayflat Road and State Highway 1
State Highways
1
Waterways
Pacific Ocean
Other Location Info
Park Unit: Sonoma Coast State Beach/Bodega Head District: Russian River City/Nearest Community: Bodega Bay

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print