McEvoy Design Review

2 Documents in Project

Summary

SCH Number
2006112107
Lead Agency
Marin County
Document Title
McEvoy Design Review
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2007
Present Land Use
AG1 (Agricultural, 1 unit per 30 to 60 acres); A-60 (Agricultural District, 60 acre minimum lot size)
Document Description
The currently proposed project is for the construction of an approximately 250-kW wind energy conversion system for the generation of electricity. The proposed wind energy conversion system (WECS) consists of approximately 138-foot tall tubular tower with a 14-foot diameter base mounted with a Furlander FL250 wind turbine or equivalent wind turbine. The Furlander FL250 wind turbine rotor has a radius of 52 feet resulting in a maximum WECS height of approximately 189 feet. The project includes the installation of an underground 6-inch, 12k volt power line delivering electricity generated from the windmill to an existing transformer station. The project also includes improvements to an existing roadway for regular maintenance activities, and construction of a roadway extension to access the project site for purposes of erecting the WECS.

Contact Information

Name
Curtis Havel
Agency Name
Marin County Community Development Agency
Contact Types
Lead/Public Agency

Location

Cities
Novato, Petaluma
Counties
Marin
Cross Streets
Red Hill Road / Point Reyes Petaluma Road
Zip
94952
Parcel #
125-070-05, 06, 16
State Highways
101

Notice of Determination

Approving Agency
Marin County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.