Boardman Canal and Gold Run Improvement Project

4 Documents in Project

Summary

SCH Number
2006112090
Lead Agency
Placer County Water Agency
Document Title
Boardman Canal and Gold Run Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2006
Document Description
The proposed project includes the construction of an approximately 7,950-foot pipeline (in three segments) to replace fragile portions of pipe within the Gold Run pipeline alignment. The proposed project includes the construction of a new 36-inch diameter ductile iron pipeline that would tie-in to the existing Boardman Canal at the upstream and downstream portions of Phase 4. The proposed project would include the abandonment of portions of the existing Boardman Canal and Gold Run pipeline in each section is complete. Construction of the upstream portion of Phase 4 would include trenching in the west-bound lane of Lincoln Road, approximately one foot off the centerline of the road, and two jack and bore crossings under the existing railroad tracks. A new diversion structure, trash rack, and driveway from Lincoln Road to access these facilities would be constructed. Construction of Phase 3 and the downstream portion of Phase 4 would include trenching in the west-bound lane of Gold Run Road, approximately one foot off the centerline of the road. A new control valve structure and driveway would be constructed within the downstream portion of Phase 4, and a new 12-inch diameter pipeline would be installed under Gold Run Road and I-80 and along Magra Road to service eight existing connections located on the opposite side of the freeway.

Contact Information

Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Lincoln, Magra, and Gold Run Roads
Zip
95714
Total Acres
1.1
State Highways
I-80
Railways
UPRR
Waterways
Boardman Canal, Bear River
Township
15N
Range
10E
Section
3, 4
Base
MD
Other Location Info
City/Nearest Community: Gold Run

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print