New Crystal Springs Bypass Tunnel Project

5 Documents in Project

Summary

SCH Number
2006112077
Lead Agency
City and County of San Francisco
Document Title
New Crystal Springs Bypass Tunnel Project
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2008
Present Land Use
Open Space, pipe storage, and valve vaults/RM-Resource Management
Document Description
The New Crystal Springs Bypass Tunnel (NCSBT) would construct a 4,200 foot long tunnel with a 96-inch diameter steel pipeline below Polhemus Road in an unincorporated area of San Mateo County, on the San Francisco Peninsula. The tunnel would convey drinking water to northern San Mateo County and San Francisco customers. An existing 96-inch prestressed concrete pipeline currently conveys water to these customers. The SFPUC determined that the existing pipeline had been subject to significant geologic hazards from slope instability, which could damage the pipeline and interrupt water service. The proposed tunnel would be located approximately parallel to Polhemus Road with one shaft (South Shaft) located adjacent to a decommissioned SFPUC fluoride confluence with Polhemus Creek. Minor ancillary construction would also occur above ground near the North Shaft area. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2007-0503-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Husam Masri, San Francisco Public Utilities Commission.

Contact Information

Name
Wes Stokes
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Hillsborough
Counties
San Mateo
Cross Streets
Polhemus Road and Crystal Springs Road
Zip
94402
Parcel #
09314103,093070050
State Highways
92
Schools
Serra High, Highlands Elementary, Odyssey School
Waterways
Polhemus Creek, San Mateo Creek
Township
5S
Range
4W
Base
MDB&M

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.