Phase 1b, 1c and 2 Implementation

9 Documents in Project

Summary

SCH Number
2006112070
Lead Agency
Tahoe Conservancy (California Tahoe Conservancy)
Document Title
Phase 1b, 1c and 2 Implementation
Document Type
NOD - Notice of Determination
Received

Document Description
Construction of 8,615 feet of bike trail, including boardwalk and bridge segments to AASHTO share-use trail standards. This action includes: construction of a pedestrian bridge over Trout Creek, intersection safety improvements, limited tree removal, placement of interpretive and way finding signage, and restoration of wetland and stream environment zone disturbance related to existing redundant foot trails.

Contact Information
Sue Rae Irelan
California Tahoe Conservancy
1061 Third Street
South Lake Tahoe, CA 96150

(530) 525-9137

Location

Coordinates
38°55'4.19"N 119°58'41.02"W
Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Begins at Sierra Blvd and Barbara Ave (former US Hwy 50 Bypass Corridor)
Zip
96150
Total Acres
117.6
Parcel #
Numerous
State Highways
Hwy 50
Railways
No
Airports
Lake Tahoe
Schools
Lake Tahoe Community College
Waterways
Upper Truckee River, Trout Creek
Township
12N
Range
18E
Section
3
Base
MDB&M

Notice of Determination

Approving Agency
California Tahoe Conservancy Board
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
1061 Third Street, South Lake Tahoe CA 96150

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search