Revised South Tahoe Greenway Shared-Use Trail
9 Documents in Project
Summary
SCH Number
2006112070
Lead Agency
California Tahoe Conservancy
Document Title
Revised South Tahoe Greenway Shared-Use Trail
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2013
Present Land Use
Varies throughout 9.6 mile long trail corridor - Recreation, Conservation, and Residential
Document Description
Construction of 2,500 linear feet of bike trail to AASHTO shared-use trail standards. This action includes: intersection safety improvement at Glenwood Way/Becka Drive/Rancho Drive to install all-way stop control and a crosswalk, limited tree removal (24 inches depth by height and less), restoration of existing, redundant foot trails, and acceptance of a Special Use Permit from the U.S. Forest Service for trail construction across two National Forest parcels, easement acquisition across two private parcels, to support construction of future phases of the trail.
Contact Information
Name
Sue Rae Irelan
Agency Name
California Tahoe Conservancy
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Begins at Sierra Blvd and Barbara Ave (former US Hwy 50 Bypass Corridor)
Zip
96150
Total Acres
117.6
Parcel #
Numerous
State Highways
Hwy 50
Railways
No
Airports
Lake Tahoe
Schools
Lake Tahoe Community College
Waterways
Upper Truckee River, Trout Creek
Township
12N
Range
18E
Section
3
Base
MDB&M
Notice of Determination
Approving Agency
California Tahoe Conservancy Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.