Pardee Drive, Motor Freight Terminal
3 Documents in Project
Summary
SCH Number
2006112050
Lead Agency
Port of Oakland
Document Title
Pardee Drive, Motor Freight Terminal
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2007
Present Land Use
GP: Business Mix
Document Description
The project sponsor, Swan Terminal LLC, proposes to construct a freight transfer terminal with 64 dock doors on the eight-acre site located on the eastern portion of the PCA Parking property at the northern terminus of Pardee Drive. The transfer terminal would receive regional packages from large-scale trucks and sort them to smaller truck for local deliveries. The distribution building would extend up to 20 feet 6 inches in height. The building would include a 19,800 sq. ft. dock facility with 64 doors and a 3,000 sq. ft. office. The office would include a dispatch center, conference room, driver's room, a sales office, and restrooms. A total of 238 parking spaces are proposed for the site, including 92 automobile parking spaces, 65 28-foot trailer parking spaces, 47 53-foot trailer parking spaces, and 34 tractor parking spaces.
Contact Information
Name
Anne M. Wattington
Agency Name
Port of Oakland
Contact Types
Lead/Public Agency
Phone
Location
Cities
Oakland
Counties
Alameda
Cross Streets
Pardee Drive
Total Acres
13.27
Parcel #
2004-158-125 Parcel B
State Highways
I-880, SR-61
Railways
BART, UPRR
Airports
Oakland International Airport
Waterways
San Leandro Channel, San Francisco Bay
Notice of Determination
Approving Agency
Port of Oakland
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.