San Francisco International Airport Combustion Turbine Project

2 Documents in Project

Summary

SCH Number
2006112036
Lead Agency
City and County of San Francisco
Document Title
San Francisco International Airport Combustion Turbine Project
Document Type
NOD - Notice of Determination
Received
Posted
8/9/2007
Document Description
The San Francisco Public Utilities Commission proposes to construct and operate a 48-megawatt (MW) natural gas-fired, simple-cycle power plant. The project would connect with the SFIA electrical distribution network through an underground 115-kV electrical transmission line extending for 1.05 miles from the plant to its terminus, adjacent to South Airport Boulevard, where it connects to substations BA and CA. Along that route, the project transmission line would also connect with a new PG&E switchyard and a new project substation (the CB Substation), both located along North Access Road. The project would also include a new, 0.95-mile-long natural gas pipeline that would be aligned within North Access Road right-of-way to connect with PG&E Line 101 at a location near South Airport Boulevard. Water for the plant would be supplied by the SFIA potable water system, and wastewater would be sent to the SFIA Mel Leong Wastewater Treatment Plant adjacent to the project site. No demolition would be required as part of the project.

Contact Information

Name
Leigh Kienker
Agency Name
San Francisco Planning Department
Contact Types
Lead/Public Agency

Location

Cities
South San Francisco
Counties
San Mateo
Cross Streets
North Access Road and Clearwater Drive
Total Acres
2 (plant site)
State Highways
I-380 and Hwy. 101
Railways
Commuter rail line to west
Airports
San Francisco International
Schools
San Francisco City College Aviation School and North Brae School
Waterways
San Francisco Bay
Township
3S
Range
5W
Section
26
Base
MDBM

Notice of Determination

Approving Agency
City and County of San Francisco
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print