La Loma Sanitary Sewer Lift Station Upgrades

3 Documents in Project

Summary

SCH Number
2006112008
Lead Agency
City of Modesto
Document Title
La Loma Sanitary Sewer Lift Station Upgrades
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2007
Document Description
The proposed project includes constructing a new sewer lift station in Moose Park, abandoning the existing La Loma Lift Station drywells, abandoning-in-place the existing creek crossing, adding a new 10" pipe encased in a 24" carrier pipe under Dry Creek, and adding a new manhole on the east side of dry creek. Gravity flow from the existing lift station wet well will be routed through a 10" pipe encased within a 24-inch steel carrier pipe north to the new lift station. A new 6" forcemain from the new lift station will tie in to an existing 6-inch forcemain. A new 8-inch pipe encased within an 18-inch steel carrier pipe will be installed El Rio Avenue to replace an aging pipe that currently serves residential units in the area.

Contact Information

Name
Dean Phillips
Agency Name
City of Modesto
Contact Types
Lead/Public Agency

Location

Cities
Modesto
Counties
Stanislaus
Cross Streets
Downey Avenue and Morton Boulevard
Parcel #
Various
Railways
UPRR
Airports
Modesto City-County
Schools
Wilson, La Loma JH, Oroville Wright, Downey HS, John Muir School

Notice of Determination

Approving Agency
Modesto City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print