Scott Road Booster Station and Pipeline Project

2 Documents in Project

Summary

SCH Number
2006111118
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Scott Road Booster Station and Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
2/21/2007
Document Description
Eastern Municipal Water District (EMWD) intends to construct a booster station and water transmission pipeline in the community of Menifee. Ongoing development growth within the community of Menifee is straining the capability of EMWD to keep up with current demands. As a result, EMWD is proposing the Scott Road Booster Station and Pipeline Project to improve the transmission and circulation capacity of potable water to relieve the demand on existing water infrastructure within EMWD's service area. The project will consist of a 5,000 gallon per minute booster station and the installation of approximately 12,000 linear feet of water transmission pipeline to convey potable between the 1627 and 1700 pressure zones to serve development in the Menifee area. The booster station will be located on the southwest corner of the intersection of Scott Road to just east of Menifee Road where it will tie-in to an existing pipeline. The pipeline will also extend north from the pump station within El Centro Lane to the intersection of El Centro Lane and Wickerd Road, it will then extend east along Wickerd Road to the intersection of Wickerd and Leon Roads where it will tie-in to an existing pipeline. Upon completion, the project will convey and provide potable water to meet demand within the Menifee community.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Regions
Unincorporated
Cross Streets
Scott Road and El Centro Lane
Zip
92584
Other Location Info
City/Nearest Community: Menifee

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print