Burbank Water Reclamation Plant (BWRP) Equalization Basin Project

2 Documents in Project

Summary

SCH Number
2006111112
Lead Agency
City of Burbank
Document Title
Burbank Water Reclamation Plant (BWRP) Equalization Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2008
Present Land Use
General Industrial, M-2
Document Description
The City of Burbank is proposing a number of improvements to the Burbank Water Reclamation Plant (BWRP). These improvements would be implemented in two packages. Package A and Package B, which are collectively referred to as the "Equalization Basin Project." Package A will include a covered aqua ammonia feed facility with secondary containment designed to receive bulk tank truck deliveries of 19% aqua ammonia. The facility will include 2 bulk storage tanks, an ammonia vent scrubber, two aqua ammonia metering pumps, and associated piping. The second package, package B, includes the installation of primary effluent equalization. Package B includes the construction of a new underground equalization basin, associated pumps, a primary effluent diversion structure, new secondary clarifiers, a return activated sludge pumping station, and replacement of multi-stage blowers with single-stage blowers.

Contact Information

Name
Jay Forbes
Agency Name
City of Burbank
Contact Types
Lead/Public Agency

Location

Cities
Burbank
Counties
Los Angeles
Cross Streets
Lake Street and Chestnut Street
Zip
91502
Parcel #
2449-031-911
State Highways
I-5
Railways
MTA and UPRR
Airports
Bob Hope Airport
Schools
Multiple
Waterways
Burbank Western Channel

Notice of Determination

Approving Agency
City of Burbank
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print