Santiago Creek Recharge Enhancement Project

3 Documents in Project

Summary

SCH Number
2006111104
Lead Agency
Orange County Water District
Document Title
Santiago Creek Recharge Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/31/2008
Present Land Use
Open Space/Open Space
Document Description
The operator proposes to alter the streambed and bank through the maintenance activities within Santiago Creek to increase the rate and quantity of groundwater recharging along the creek. As a result of the scouring of the creek bottom from previous storms, the depositing of fill material into the creek and the accumulation of debris and weeds along the channel bottom, existing surface waters along the creek are confined to a limited portion of the creek channel. The proposed project would remove the existing debris and grade the channel bottom at three different segments of Santiago Creek to create a flatter surface that would allow the flow of surface water to spread out and cover a larger area.

Contact Information

Name
Naeem Siddiqui
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Orange
Counties
Orange
Cross Streets
Along 3 segments of Santiago Ck, btwn Hart Park and east of SR-55
Total Acres
7.76
State Highways
SR-55
Airports
John Wayne Airport
Waterways
Santiago Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No