Capistrano Bluffs/Pines Park Sewer Project

2 Documents in Project

Summary

SCH Number
2006111103
Lead Agency
South Coast Water District
Document Title
Capistrano Bluffs/Pines Park Sewer Project
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2007
Present Land Use
Recreation/Open Space Z: "REC" Recreational and "CONS" Conservation
Document Description
The Capistrano Bluffs/Pines Park Sewer Project, proposed by the South Coast Water District, is intended to relieve an existing sewer line operating at full capacity. The proposed project would consist of a ten-inch pipeline that would convey sewage from an eight-inch pipeline within Camino Capistrano to an 18-inch pipeline within Coast Highway. The proposed pipeline would traverse through the northwestern portion of Pines Park and along an existing surfer trail down to Coast Highway. A total of seven new manholes are proposed as part of the project. Raised (above grade) for aesthetic and safety reasons. There are no pump stations proposed, as the sewage flows would be conveyed by gravity. The proposed pipeline would have a design capacity of at least 1.5 million gallons per day (MGD).

Contact Information

Name
Robert Clark
Agency Name
South Coast Water District
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
Camino Capistrano
Zip
92624
Parcel #
123-401-03, 06
State Highways
1 and 5
Railways
Orange County Transportation Aut
Schools
Palisades ES
Waterways
Pacific Ocean
Township
8S
Range
8W
Base
SBBM
Other Information
Railways: Authority Metrolink Railroad

Notice of Determination

Approving Agency
South Coast Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print