La Costa Glen Corporate Center - GPA 06-02/MP 92-01(B)/LCPA 06-01/HMPP 06-11/SDP 05-16/CDP 05-51/HDP 05-11/MS 05-28
2 Documents in Project
Summary
SCH Number
2006111092
Lead Agency
City of Carlsbad
Document Title
La Costa Glen Corporate Center - GPA 06-02/MP 92-01(B)/LCPA 06-01/HMPP 06-11/SDP 05-16/CDP 05-51/HDP 05-11/MS 05-28
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2007
Present Land Use
Vacant, previously graded pad, revegetated slopes and undisturbed habitat.
Z: PC
GP: Commercial/Office/Medium High Density Residential (C/O/RMH)
Document Description
A General Plan Amendment, Master Plan Amendment, Local Coastal Program Amendment, Habitat Management Plan Permit, Site Development Plan, Coastal Development Permit, Hillside Development Permit, and Minor Subdivision Map are required for the proposed 4-lot subdivision and development which will result in two developable parcels and two open space parcels. A proposed 21,904 sf office building is proposed for Lot 1 and future development of Lot 2 would be limited to approximately 13,000 sf of commercial retail use. Open Space Lots 3 and 4 comprise 2.67 acrse (34% of the project area). The open space lots will have new General Plan Land Use designations of OS (Open Space).
Contact Information
Name
Barbara Kennedy
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
Northwest of Calle Barcelona, west of El Camino Real and north of Leucadia Boulevard
Total Acres
7.82
Parcel #
255-012-05
State Highways
I-5
Railways
NCTD
Airports
McClellan/Palomar
Schools
Encinitas School District
Waterways
Batiquitos Lagoon
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.