Aspen Investments Industrial Subdivision 2005-TM-02

2 Documents in Project

Summary

SCH Number
2006111089
Lead Agency
City of Santa Paula
Document Title
Aspen Investments Industrial Subdivision 2005-TM-02
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2010
Document Description
The State of California Department of Fish and Game is entering into a Lake and Streambed Alteration Agreement (SAA # 1600-2009-0149-R5 revision3) with Aspen Companies, pursuant to Section 1602 of the Fish and Game Code. The Applicant intends to alter the streambed by constructing an industrial subdivision (Tract No. 5428) in the Santa Paula area. There are two small drainages on-site, including a storm drain outlet, which drain adjacent areas and ultimately empty in to the Santa Clara River. These drainages (0.22 acres permanent impact) will be permanently impacted in the construction of the site and the storm drain will be relocated to outlet in to a concrete trapezoidal channel that will run along the western edge of the property and outlet at a 15' x 15' quarter-ton ungrouted riprap pad. Surface flows from the site will be directed in to a newly constructed retention basin (estimated 300sf) at the south-western end of the project footprint. This basin will be constructed at river elevation and an outlet channel to the retention basin will consist of 2-50 foot long by 5 feet wide ungrouted riprap bank structures. The basin will be accessed from an adjacent area within the project footprint. The remaining portion of the site will be raised from the current elevation. The southern end of the project site will consist of the construction of a new bank placed at the Public Levee and Bank Protection Line.

Contact Information

Name
Jeff Humble
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Santa Paula
Counties
Ventura
Cross Streets
Santa Maria Street between Peck Road and Palm Avenue
Zip
93061
Total Acres
25.02
Parcel #
104-0-107-41
State Highways
SR-126
Railways
UPRR
Airports
Santa Paula Airport
Schools
Santa Paula ES and HS
Waterways
Santa Clara River

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.