Piru Creek Bank Protection Project

5 Documents in Project

Summary

SCH Number
2006111007
Lead Agency
Ventura County Watershed Protection District
Document Title
Piru Creek Bank Protection Project
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2008
Present Land Use
Open Space, R-6 Residential
Document Description
The project includes protection and restoration of the west bank of Piru Creek, which forms the outside bend of the Creek within the community of Piru. The bank would be protected with vegetated rock rip-rap at the toe of the slope, a turf reinforcement mat above the toe rock, and native revegetation of the upper earthen slope, and turf reinforcement mat. These project elements would be implemented along approximately 600 feet of the west construction. Immediately following construction, the flow lines of the stream would be revegetated and the water would be diverted back to the original flow line on the west side of the channel.

Contact Information

Name
Jeff Pratt
Agency Name
Ventura County Watershed Protection District
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Regions
Unincorporated
Cross Streets
Main Street and Orchard Street
Zip
93040
Total Acres
5
Parcel #
Various
State Highways
126
Railways
Fillmore-Western
Schools
Piru Elementary
Waterways
Piru Creek, Santa Clara River
Township
4N
Range
18W
Section
20
Base
SBB&M
Other Location Info
City/Nearest Community: Piru

Notice of Determination

Approving Agency
Ventura County Watershed Protection District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print