Zone 7 Patterson Pass Water Treatment Plant (WTP) Ammonia Facility Replacement Project

2 Documents in Project

Summary

SCH Number
2006102121
Lead Agency
Zone 7 Water Agency
Document Title
Zone 7 Patterson Pass Water Treatment Plant (WTP) Ammonia Facility Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2006
Present Land Use
Water Treatment Facility / Large Parcel Agricultural / Water Management
Document Description
As part of the disinfection process, Zone 7 uses chloramination to minimize formation of disinfection byproducts ad chlorinous taste and odors, and to maintain a disinfectant residual in the distribution system. The proposed project includes the removal of the existing gaseous ammonia system at the Patterson Pass Water Treatment Plant (WTP) and replacement with an aqua (or liquid) ammonia system (using a 19 percent ammonia solution). The existing gaseous ammonia delivery components are near the end of their service life and the proposed project is intended to replace the existing system in order to improve the reliability of plant operations and employee and public safety. New facilities proposed under the project include an aqua ammonia tank and storage building, a chemical fill station and underground containment structure, and two additional feed lines. No substantive changes in treatment plant capacity or operation are anticipated as part of the proposed project.

Contact Information

Name
Jack Fong
Agency Name
Zone 7 Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Livermore
Counties
Alameda
Cross Streets
Greenville Road and Patterson Pass Road
State Highways
I-580
Waterways
Arroyo Las Positas

Notice of Determination

Approving Agency
Zone 7 Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print