Lower Hetch-Hetchy Sewer Rehabilitation Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2006102034
- Lead Agency
- Union Sanitary District
- Document Title
- Lower Hetch-Hetchy Sewer Rehabilitation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/24/2007
- Present Land Use
- Alignment borders Hetch-Hetchy Aqueduct ROW and within Moores Avenue
- Document Description
- The proposed project includes the rehabilitation of approximately one mile of existing trunk sewer through the Cured-in-Place Pipe method. The CIPP involves using existing manholes to insert into the deteriorated pipe a resin-filled flexible tube that lines the sewer line by inversion. Water pressure is used to propel the inverting tube through the pipe and then hot water or steam is circulated through the fully inverted tube whereby the resin is cured and a new pipe is formed.
- Contact Information
-
kari Schumaker
State Water Resources Control Board
Lead/Public Agency
1001 I Street, 16th Floor
Sacramento, CA 95814
Phone : (916) 341-7388
Location
- Cities
- Newark
- Counties
- Alameda
- Cross Streets
- Manzanita, Robertson, Birch, Smith, Bellflower, Cedar
- Zip
- 94560
- State Highways
- 880
- Railways
- UPRR
- Schools
- Bunker, Newark Memorial, Azeveda, Maloney, Glenmore, Mattas, New
- Waterways
- Newark Slough
- Township
- 5S
- Range
- 1W
- Section
- 6
- Base
- Newark
- Other Information
- Schools: Newark Jr., Lincoln, Schilling, Graham, Musice, St. Edwards, Milani.
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Resources Control Board, 1001 I Street, 16th Floor, Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.