Consider Adoption of an Environmental Impact Report and Issuance of a General Lease - Right of Way

5 Documents in Project

Summary

SCH Number
2006102033
Lead Agency
California State Lands Commission
Document Title
Consider Adoption of an Environmental Impact Report and Issuance of a General Lease - Right of Way
Document Type
NOD - Notice of Determination
Received
Posted
4/1/2008
Present Land Use
The pipeline will cross predominantly agricultural land in unincorporated areas of Sacramento and San Joaquin Counties. The Cosumnes River Preserve and Stone lakes National Wildlife Refuge are within the project area.
Document Description
PG&E is proposing to replace ~11 miles of a partiall inactive natural gas transmission line, Line 108, which extends from the Thornton Station, just south of the Mokelumne River, to the Elk Grove Station, just south of Elk Grove Blvd. The proposed new pipeline diameter would be 24". PG&E would also install a pressure limiting station at the Elk Grove Station and remove bridge crossing the Cosumnes River.

Contact Information

Name
Paul Thayer
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento, San Joaquin
Total Acres
11 mi. long
Railways
Union Pacific Rail Road
Airports
Franklin Field
Schools
Elk Grove and Thornton
Waterways
Mokelumne River, Cosumnes River, Sacramento River, irrigation canals

Notice of Determination

Approving Agency
California State Lands
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.