El Dorado 50 and 89 Water Quality Improvement Projects

3 Documents in Project

Summary

SCH Number
2006102021
Lead Agency
California Department of Transportation, District 3
Document Title
El Dorado 50 and 89 Water Quality Improvement Projects
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2008
Present Land Use
Existing state highway right-of-way
Document Description
This project would implement a program of water quality improvement measures along segments of U.S. Highway and State Route 89 to comply with National Pollutant Discharge Elimination System (NPDES) permit requirements and to address planned improvements and changes that are part of the Lake Tahoe Environmental Improvement Program (EIP). To achieve the above objectives, a preliminary program of improvements has been developed and will be refined as each segment or element of the project is further evaluated and designed.

Contact Information

Name
Christopher Carlton
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
On U.S. Hwy 50 between Old Meyers Rd. & Nevada Stateline & SR 89 between Alpine&Placer Co. lines
State Highways
SR 89 and US 50
Airports
South Lake Tahoe
Schools
Lake Tahoe and Truckee District
Waterways
Upper Truckee River, Grass Lake/Creek, various creeks and drainages

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print