The Master's College Master Plan Project (Master Case No. 04-496)

7 Documents in Project

Summary

SCH Number
2006101171
Lead Agency
City of Santa Clarita
Document Title
The Master's College Master Plan Project (Master Case No. 04-496)
Document Type
NOD - Notice of Determination
Received
Posted
2/17/2009
Document Description
This is a request for approval of a Master Plan to guide the future development of The Master's College campus; a tentative tract map to create 42 single family residences, south of future Dockweiler Drive, and to construct and extend Dockweiler Drive and Deputy Jake Drive through the project site. The applicant proposes to develop 95 acres of property owned by The Master's College and grade on 12.69 acres that are located off oh The Master's College property through a Master Plan proposal for college, assembly, roadways, and open space uses. The applicant also proposes a tentative tract map to subdivide the project site into 42 single family residences, 5 college lots, 3 HOA lots, open/space/park/Newhall Creek lots, and one water quality basin lot. The applicant proposes to extend Dockweiler Drive and Deputy Jack Drive from each terminus, through the project site.

Contact Information

Name
James Chow
Agency Name
City of Santa Clarita
Contact Types
Lead/Public Agency

Location

Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Placerita Canyon Road and Meadview Avenue
Zip
91321
Total Acres
107.65
State Highways
SR-126
Railways
Metrolink
Schools
McGrath Elementary

Notice of Determination

Approving Agency
City of Santa Clarita
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.