East Gate Installation

2 Documents in Project

Summary

SCH Number
2006101143
Lead Agency
University of California, Santa Barbara
Document Title
East Gate Installation
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2006
Present Land Use
Academic Uses
Document Description
The East Gate Installation project is proposed approximately 250 feet northeast of the roundabout located at the intersection of Highway 217, Mesa Road and Lagoon Road. The project includes the construction of three wall sections ranging in height from eight to 18.9 feet. The approximate lengths of the three walls are 90 feet for the northern wall (radiused to the east), 12 feet for the center wall, and 30 feet for the southern wall (radiused to the west). Walls are to be clad in a sandstone veneer. The project includes the placement of a 2.5-foot high, 6-foot wide, approximately 80-foot long steel beam, clad in a bronze skin, placed on top of the three walls to span the roadway. The project is designed with a minimum of 16 feet clearance to allow adequate distance for large vehicles to pass under the structure.

Contact Information

Name
Jennifer Metz
Agency Name
University of California, Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Goleta, Santa Barbara
Counties
Santa Barbara
Cross Streets
Ocean Road
Total Acres
~ 0.25
State Highways
217
Airports
Santa Barbara
Waterways
Goleta Slough, Pacific Ocean
Other Location Info
City/Nearest Community: Isla Vista

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.