Solana Beach Elementary School Site No. 7

3 Documents in Project

Summary

SCH Number
2006101058
Lead Agency
Solana Beach Elementary School District
Document Title
Solana Beach Elementary School Site No. 7
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2006
Present Land Use
Vacant and graded. Z: RS-1-13, Low Density Residential GP: Elementary School site
Document Description
The proposed project site is located in the City of San Diego, approximately 3.8 miles east of the coast, within an area of residential development in an approved planned community known as Pacific Highlands Ranch. Pacific Highlands Ranch is Subarea III of the City's North City Future Urbanizing Area (NCFUA) and encompasses approximately 2,652 acres. The school site is part of Unit 5, on a site designated for an elementary school, an area of development within Pacific Highlands Ranch, which was previously approved by the City of San Diego. The proposed project includes site acquisition, construction, and operation of a K-6 school. School construction is expected to begin in 2007 and be completed by 2009. The proposed school is expected to serve approximately 649 students drawn from the surrounding areas and is estimated to employ 30 faculty and staff. The school is proposed to be a traditional track education facility.

Contact Information

Name
Caroline J. Brown
Agency Name
Solana Beach Elementary School District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Pacific Highlands Ranch Parkway north of Carmel Valley Road
Zip
92075-1298
Total Acres
11.7
State Highways
SR-56
Waterways
Gonzales Canyon Creek
Other Location Info
Pacific Highlands Ranch

Notice of Determination

Approving Agency
Solana Beach School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print