East Garden Grove-Wintersburg Maintenance and Repair Project

3 Documents in Project

Summary

SCH Number
2006101036
Lead Agency
Orange County
Document Title
East Garden Grove-Wintersburg Maintenance and Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2010

Document Description
The project will include the following components: Earthen berm and backside sheet pile toe protection (from 2, 100 ft downstream of Graham Street to 4,000 ft downstream of Graham Street); park trail and coastal access on the earthen berm; side-slopes riprap revetment repair; notched retaining walls to accommodate existing utility lines; and future maintenance and monitoring including cathodic protection of the steel sheet piles.

Contact Information
Paul D. Thayer
California State Lands Commission
100 Howe Avenue, Suite 100-South
Sacramento, CA 95825-8202

Phone : (916) 574-1800
Fax : (916) 574-1810

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Graham Street and Warner Avenue
Zip
92647
Parcel #
Various
State Highways
SR-1
Schools
Marine View MS
Waterways
CO5 Channel, Pacific Ocean
Township
5S
Range
11W
Section
29

Notice of Determination

Approving Agency
State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California State Lands Commission 100 Howe Ave, Suite 100-South Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print