East Garden Grove-Wintersburg Channel (SAA #1600-2009-0331-R5)

3 Documents in Project

Summary

SCH Number
2006101036
Lead Agency
Orange County
Document Title
East Garden Grove-Wintersburg Channel (SAA #1600-2009-0331-R5)
Document Type
NOD - Notice of Determination
Received

Document Description
DFG is intending to execute a Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (SAA # 1600-2009-0331-R5) to the project applicant, Orange County Public Works. The applicant proposes to construct dual rows of sheet piles to replace the existing levees from 2,100 feet downstream of Graham Street to Warner Ave on the south levee and from Graham Street to Warner Avenue on the north levee. The earthen side slopes will be excavated back to the sheet piles to provide for 100-year storm water conveyance capacity. Slater Bridge will also be removed, and the existing south side levee will be fortified with an earthen buttress and backside sheet pile toe protection to protect the levee from tidal erosion. A park trail and ADA access ramp will be created on the new earthen buttress, and existing rip rap slopes ( from tide gates to Oil Road bridge on the north side and from the tide gates to Bates Circe on the south side) will be repaired as needed. Notched retaining walls will be added to the Warner and Graham Street Bridges to accomodate sewer lines and other utilities.

Contact Information
Mr. Barabe
Department of Fish and Game
4949 Viewridge Ave
San Diego, CA 92123

858-467-2717

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Graham Street and Warner Avenue
Zip
92647
Parcel #
Various
State Highways
SR-1
Schools
Marine View MS
Waterways
CO5 Channel, Pacific Ocean
Township
5S
Range
11W
Section
29

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
County of Orange 300 North Flower Street Santa Ana, CA 92702

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No