Reservoir 7990-2
3 Documents in Project
Summary
SCH Number
2006101002
Lead Agency
Coachella Valley Water District
(CVWD)
Document Title
Reservoir 7990-2
Document Type
NOD - Notice of Determination
Received
Posted
11/27/2006
Present Land Use
Government Services
GP: Government Services
Document Description
The Reservoir 7990-2 project proposes the construction of a 500,000-gallon, steel water reservoir on the same 2-acre parcel of the existing 500,000-gallon Reservoir 7990-1 that was constructed in 1973. The project includes shallow excavation to construct a concrete ring wall and all appurtenances necessary to connect the reservoir to the existing domestic water system on-site. The purpose of the Reservoir 7990-2 project is to provide additional water storage for increasing domestic water and fire protection demands within the North Shore and Area 23 Pressure Zones, which include the areas of North Shore, Bombay Beach, and Hot Mineral Spa. This additional water storage reservoir will provide energy savings by alleviating the need to operate associated domestic water wells during peak electrical consumption periods. In addition, a second reservoir will allow removal of one reservoir from service for routine maintenance and repairs.
Contact Information
Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
Hayes Street / Avenue 70
Zip
92254
Total Acres
0.50
Parcel #
729-120-020
State Highways
111
Railways
UPRR
Waterways
Salton Sea
Township
7S
Range
9E
Section
27
Base
SB
Other Location Info
City/Nearest Community: North Shore
Notice of Determination
Approving Agency
Board of Directors of the Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.