Floriston Bridge Replacement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2006092110
- Lead Agency
- Nevada County
- Document Title
- Floriston Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/11/2008
- Document Description
- The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2007-0138-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Nevada County Department of Transportation. The project proposes to replace the existing bridge with a cast-in-place, box girder structure. The existing bridge deck will be demolished. The existing pier walls will not be replaced, but will be extended to meet and match the height of the new soffit. The new bridge will be the same size as the existing, but will have a soffit elevation approximately 3.3 feet higher to allow conveyance of the 100-year flood. A temporary Bailey style bridge will be placed just east of the existing bridge to serve as a detour.
- Contact Information
-
Gary L. Hobgood
California Department of Fish and Game
Lead/Public Agency
North Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670
Phone : (916) 983-6920
Location
- Cities
- Truckee
- Counties
- Nevada
- Cross Streets
- I-80
- Zip
- 96111
- State Highways
- I-80
- Railways
- SPRR
- Waterways
- Truckee River
- Township
- 18N
- Range
- 18E
- Section
- 30
- Base
- Boca
Notice of Determination
- Approving Agency
- California Department of Fish and Game
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Nevada County Department of Transportation 950 Maidu Avenue Nevada City, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.