Greenwood Lake Water Treatment Plant and Treated Water Transmission Line

6 Documents in Project

Summary

SCH Number
2006092081
Lead Agency
Georgetown Divide Public Utilities District
Document Title
Greenwood Lake Water Treatment Plant and Treated Water Transmission Line
Document Type
NOD - Notice of Determination
Received
Posted
8/2/2013
Present Land Use
Vacant (site of existing lake and buffer lands) / Agriculture / Agricultural Lands
Document Description
The California Department of Public Health is a responsible agency for this project. The Department's Safe Drinking Water Proposition 50 Program is providing state funds for the project. The Georgetown Divide PUD proposes to install new SCADA equipment at the Auburn Lakes Trails and Walton Lake Water Treatment Plants. The SCADA system will provide mointoring for the raw water supply, treatment plant flow, performance, and for critical pump and treatment plant operating systems, as well as water distribution systems.

Contact Information

Name
Kelly Shively
Agency Name
Georgetown Divide Public Utilities District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Spanish Dry Diggins Road / Reservoir Road
Zip
95634
Total Acres
18.5
Parcel #
061-042-059
State Highways
193
Waterways
Greenwood Lake and Georgetown Divide Ditch
Township
13N
Range
10E
Section
31
Base
MD
Other Location Info
City/Nearest Community: Georgetown/Greenwood

Notice of Determination

Approving Agency
Georgetown Divide Public Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.