Kern Valley State Prison Arsenic Removal Water Treatment System

2 Documents in Project

Summary

SCH Number
2006091145
Lead Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Kern Valley State Prison Arsenic Removal Water Treatment System
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2006
Present Land Use
Correctional Facilities / Community Facilities / Community Facilities
Document Description
The CDCR is proposing to construct an arsenic removal water treatment system at Kern Valley State Prison (KVSP). The purpose of the project is to remove arsenic from groundwater for KVSP's water supply system, which serves the entire prison complex, and to meet newly adopted arsenic regulations to reduce maximum contaminant levels for drinking water. The arsenic removal water treatment system equipment includes two reaction vessels, filter, associated valves and piping, chemical injection equipment, and equipment for backwash recovery. A new water treatment plan building would be constructed to house chemicals used in the treatment process, as well as the filtration system control panel, feed pump systems, air compressor, and chemical analyzers. Improvements would be made of the existing chlorination system.

Contact Information

Name
Cher Daniels
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency

Location

Cities
Delano
Counties
Kern
Cross Streets
Cecil Avenue and Wasco-Pond Road
Zip
93215
Total Acres
0.5
Parcel #
481-300-17
Township
25S
Range
25E
Section
7
Base
MD

Notice of Determination

Approving Agency
California Department of Corrections and Rehabilitation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print